PERKOA - ZINC MINE

  • High-grade Volcanogenic Massive Sulphide (VMS) zinc deposit in Burkina Faso;
  • Probable Ore Reserves of 6.3  Mt at a mine head grade of 13.9% zinc as reported in accordance with the 2004 JORC code;
  • Proposed plant throughput of 720,000 tpa to produce 170,000 dmt/annum of clean zinc concentrate with 53% grade over a 9.5 year mine life;
  • Exploitation Licence covering all mining activities granted in March 2007;
  • DRA Mineral projects appointed EPC manager;
  • Optimise mine design to enhance mining efficiencies, reduce overall costs and expedite mine schedule to access first ore;
  • Key site contractors appointed including:Perkoa Core 02
    • Byrnecut Mining - Managing contractor for the construction and mining of the underground mine;
    • DRA Mineral projects - Engineering, Procurement and Construction Manager for plant and infrastructure;
    • Votarantim Metais - Concentrate off-take partners;
    • Transamine SAS - Administration and Logistics managers;
  • Letters of intent signed by offtake partners, Xstrata Zinc and Boliden;
  • Banlaw Africa – Construction and surface civil infrastructure;
  • Bollore – Transport logistics of ore from site to Port of Tema;
  • Outotec (formerly Outokumpu) – Manufacture and supply of Perkoa mill, flotation cells and thickener units;
  • Sandvik – Manufacture and supply of Axera 7 drilling ‘jumbo’ used for the development of the underground mine workings;
  • SHELL – Supply and management of fuel facility;
  • Caterpillar – Supply of diesel generated power station;
  • Caterpillar – Manufacture of underground mining equipment;
  • Sandvik – Supply of crushing and grinding;
  • African Explosives Limited – Supply and management of;
  • National and Overseas Modular Buildings – Supply of offices, accommodation and changeroom facilities;
  • Allterrain Services Group – Catering and camp management;
  • SOS International – Medical, Emergency and Evacuation;
  • TOYOTA – Supply of site vehicles.

  • Box cut construction completed in June 2007;
  • Advanced negotiation with potential offtake partners - Xstrata Zinc and Boliden.

    mumbwa - IORN OXIDE COPPER GOLD PROJECT

    • Interpretation of BHPB’s Falcon™ data with 3D inversions and the application of BHPB’s Solid Earth™ proprietary technology identified anomalous zones over the Kitumba Hills, Mutoya  and Mushingashi (previously 'the worm') prospects;
    • Initial discover hole, S36-001, was drilled in February to a total depth of 697.4m, and intersected mineralisation yielding 655m at 0.46% copper, including:
      • 317m @ 0.79% Cu,
      • 18m @ 0.20g/t Au,
      • 42m @ 2.01% Cu, including
      • 4m @ 5.56% Cu.
      • Soil geochemical survey over drilled anomalies displayed elevated gold response over S36;
    • In October 2009, Blackthorn Resources reported an Inferred Mineral Resource containing 345 Mt at 0.47% Cu, 0.06g/t Au, 1.38 g/t Ag and 38 ppm U when using a 0.2% Cu cut-off; (or 87Mt at 0.94% Cu, 0.05g/t Au, 1.27 g/t Ag when using a 0.5% Cu cut-off).

    MOKOPANE - NICKEL/PLATINUM PROJECT

    • Nickel-Platinum project located on the Northern limb of the Bushveld Complex;
    • Granted new order rights over 3,000 hectares for exploration purposes;
    • Appointment of Black Economic Empowerment (BEE) party;
    • Prospecting licence covers 960ha which is host to 5 individual (Southwest, Central, Northeast, Northwest and Far North) mineralised zones;
    • The Southwest Zone contains an Inferred Mineral Resource of 39.7 million tonnes at 0.15% nickel, 0.09% copper, 0.22 g/t platinum and 0.33g/t palladium as reported in accordance with the 2004 JORC code;
    • Near surface mineralisation is amenable to low cost, large scale, open pit mining with low strip ratio;
    • Significant potential to increase current mineral resource by additional drilling from all 5 prospects within the licence area;
    • Considering a percussion drilling program to further define the resource status from all 5 prospects.